District of Hope Spray Park Feasibility Study

Spray Park Feasibility Study

August 5, 2026

District of Hope – Engineering Department

Version 1.0

pipe sizing, and construction requirements can be refined during detailed design based on the selected spray park configuration. 3.4.2. Candidate Location 2A - 6th Ave nue Site Servicing Strategy Because of the size of the 6th Avenue property, servicing requirements vary depending on the selected spray park location. Separate conceptual servicing strategies have therefore been prepared for Candidate Locations 2A and 2B. Candidate location 2A, adjacent to the existing skate park, can be serviced through the existing 200 mm water main beneath the parking lot beside the conference center. The existing 200 mm watermain adjacent to the conference centre provides sufficient capacity to service a future spray park. The sanitary sewer connection to the pad could be made with a short service connection to the 200 mm asbestos concrete sewer in the lane immediately adjacent to the site, located south of Hudson Bay Street. Depending on the final alignment, installation of an additional manhole may be recommended to avoid tapping directly into the existing asbestos concrete sewer main. A conceptual servicing plan is shown in Figure 9 below.

Figure 9: Conceptual Servicing Strategy for Candidate Location 2A at 6th Avenue Fairgrounds

The optional drainage connection could likely be made into the parking lot area, near the proposed water service connection, but minimal information is currently available for the

Page 22

File: 5260-25

Made with FlippingBook - professional solution for displaying marketing and sales documents online