Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
treated water is reused throughout the facility. District Operations staff should be trained to respond to contamination events in accordance with Fraser Health requirements. Additional design measures, including perimeter fencing where appropriate, can also help discourage after- hours access by pets and wildlife and reduce the potential for contamination. Cross connection controls, typically in the form of backflow prevention devices, should be used at the municipal water service connection to prevent water from the facility from re-entering the municipal water supply. These will be required on the facility to prevent contamination of the larger system, regardless of system type.
Potable drinking water must also be provided in accordance with applicable health regulations. Given the anticipated use of the facility during hot summer weather, a drinking fountain should be located within or immediately adjacent to the spray park. Incorporating a bottle filling station is also recommended to improve user convenience and encourage hydration. Many spray park manufacturers offer integrated drinking fountain options as part of their standard product lines. Figure 11 shows an example of a drinking fountain provided at a spray park. Water Quality Highlights ✔ Flow-through systems use fresh potable water that meets drinking water standards. ✔ Recirculation systems continuously filter and disinfect water for reuse. ✔ Regular inspections and maintenance help ensure safe operation. 5.2. Fraser Health Pool Permit Spray parks are regulated as public pools under provincial health legislation and require Fraser Health approval before construction and operation.
Figure11: Implementation of Drinking Water Provided at Crossley Park in Abbotsford
Prior to construction, the District must obtain both an Application for Health Approval and a Pool Construction Permit Application. Based on recent spray park projects within the Fraser Valley, obtaining these approvals may require several months depending on project complexity and Fraser Health review timelines. Early application is recommended to avoid delays during tendering and construction. In addition, an annual operating permit will be required by Fraser Health for each season of use. Obtaining an annual operating permit typically requires an onsite inspection with a Fraser Health representative. During these inspections, Fraser Health may review facility rules posted clearly on signage at the site, a plan for daily inspection by the park operator, access to potable drinking water for users, availability of washrooms located in the immediate vicinity and
Page 27
File: 5260-25