District of Hope Spray Park Feasibility Study

Spray Park Feasibility Study

August 5, 2026

District of Hope – Engineering Department

Version 1.0

verification that the park spray elements do not spray or splash water beyond the designated pad drainage areas. Early coordination with Fraser Health during detailed design will help ensure the facility meets all applicable health and safety requirements prior to construction and operation. User Safety Concerns As with any water recreation facility, slip and fall hazards must be considered during design and operation. Spray park surfaces should incorporate slip-resistant finishes, positive drainage, and accessible walking routes while remaining free of tripping hazards. Clear signage should identify facility rules and promote safe use for all visitors. 5.3. Hope's climate is conducive to seasonal moss and algae growth, particularly on damp concrete surfaces. Routine cleaning and periodic pressure washing should therefore be incorporated into the facility's maintenance program to maintain safe walking surfaces and reduce slip hazards. Figure 12 illustrates algae accumulation observed at an existing spray park in Abbotsford.

Figure 12: Accumulation of Aglae Growth Observed at the Mill Lake Spray Park in Abbotsford

Zero-depth spray features are recommended to improve user safety while reducing opportunities for standing water and excessive algae growth. Additional safety measures should include routine inspections, scheduled cleaning, clear facility rules, and well-maintained signage. An example of spray park signage is provided in Figure 13.

Page 28

File: 5260-25

Made with FlippingBook - professional solution for displaying marketing and sales documents online