Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
In addition to the formal parking lots, informal roadside parking is currently used along portions of 6th Avenue and, to a lesser extent, 7th Avenue. These areas could be formalized in the future to accommodate increased demand. The paved area along 6th Avenue between the Hope Curling Club and Kawkawa Lake Road could accommodate approximately 33 marked parking stalls based on a 3.0 m stall width. Similarly, the road shoulder along 7th Avenue opposite the BC Hydro substation could provide approximately 24 additional stalls, although this area would require more substantial improvements, including asphalt surfacing and pavement markings. Parking observations were completed on June 8, June 15, and July 24, 2026. Figure 15 summarizes the observed parking occupancy at the 6th Avenue Fairgrounds on July 24, 2026. The front lot consistently experienced the highest use, with occupancy exceeding 50 percent on the observation dates. The
Figure 15: Parking Availability at 6th Avenue on July 24, 2026
central lot experienced moderate use of approximately 30 percent, while the rear lot generally had the lowest occupancy except when events were held at the Conference Centre. Informal parking along 6th Avenue also provided substantial additional capacity.
Site
Parking
Moderate parking with excellent walkability and downtown access Excellent parking capacity supporting larger recreation events
Memorial Park
6th Avenue
Overall, the 6th Avenue site provides greater flexibility for parking improvements than in the downtown area, where parking demand is more constrained during the summer months. However, locating the spray park at Memorial Park could also reduce overall parking requirements due to its central location and walkability for nearby residents.
Page 35
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online