Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
Flow-through systems generally have lower mechanical maintenance and staffing requirements due to their simpler design. However, these savings must be weighed against the higher water and sewer consumption associated with single-use operation. Recirculation System Operational & Maintenance Costs Recirculation systems incorporate additional mechanical and treatment components, including pumps, holding tanks, filtration equipment, chemical dosing systems, and more advanced electrical controls. As a result, labour, electricity, treatment, and equipment maintenance costs are expected to be higher than those associated with a flow-through system. 7.2.2. The additional mechanical equipment required for a recirculation system results in higher electricity consumption. Three-phase power is recommended where available to maximize equipment efficiency, with peak electrical demand may reach approximately 50 amps depending on the final design. For feasibility planning, electricity consumption was estimated using a 208- volt, three-phase service operating continuously at an average current of 20 amps during park hours. Based on these assumptions, seasonal electricity use is approximately 6,050 kWh, with an estimated cost of about $1,000 per season at current BC Hydro rates. By treating and reusing water, a recirculation system can reduce seasonal water consumption by more than 50 percent compared with a flow-through system. Water use consists primarily of the initial filling of the holding tank and ongoing make-up water required to replace losses from evaporation, splash-out, and routine maintenance. For this estimate, make-up water was assumed to equal 3 percent of the 12 L/s design flow, with spray features activated for approximately 25 percent of operating hours. Using an estimated 7.5 m³ (2,000 US gallon) holding tank, total seasonal water consumption is estimated at approximately 400 m³, with a combined water and sewer cost of about $500. An additional allowance of approximately $1,500 per season has been included for treatment chemicals and filtration media. Labour requirements for a recirculation system are substantially greater than those for a flow- through system. Seasonal startup and winterization may each require a couple of days each due to the additional pumps, tanks, filtration equipment, and treatment systems. Daily inspections must also include water quality testing in addition to basic site inspection and functionality checks. Approximately two hours of staff time per operating day has therefore been assumed. A further 60 hours per season has been allocated for periodic maintenance, filter cleaning, water quality management, and spray pad cleaning. Based on these assumptions, approximately 280 hours of labour would be required each season, representing an estimated cost of $15,400. The total estimated annual operating cost is summarized in Table 4.
Page 39
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online