2025-05-02_LIFT_V5

Technical training

Service Lift Training Standard / V5 02052025

2. Legislation and documentation

Lift manufacturers´ user manuals instructions and guides

2.1

2.2

Local and national legislation TOTAL

15 min.

3. Safety when working on a lift in a WTG

3.1

Hazardous energy

3.2

Work areas in the WTG

3.3

Formative Post-evaluation TOTAL

25 min.

4. Gates and fences

4.1 4.2

Outside the lift

Gate locking systems

4.3

Guard locking control system

4.4

Upper and lower hatches

4.5

Formative post-evaluation TOTAL

45 min.

5. Cabin and its attachment parts

5.1 5.2

The cabin

Fasteners and anchor points

5.3

Service light and emergency light

5.4

Formative post-evaluation TOTAL

55 min.

6. Cabin guide systems

6.1 6.2

Introduction to lift guiding systems

Guide ropes and guide units

6.3

Wheels and roller guide unit

6.4

Guide ladder system inspection

6.5

Formative post-evaluation TOTAL

117 min.

7. Top obstruction device

7.1 7.2

Top obstruction device function

Top obstruction device flashing light

7.3

Top obstruction in top position

7.4

Formative post-evaluation TOTAL

45 min.

8. Bottom obstruction device

8.1 8.2

Bottom obstruction device function

Bottom obstruction device – mechanical l Bottom obstruction device flashing light TOTAL

8.3

72 min.

Global Wind Organisation ©2025 / www.globalwindsafety.org

105 / 170

Made with FlippingBook flipbook maker