Technical training
Lift Standard / V3 2023-05-02
To activate several participants at the same time, the pre-use inspections may be conducted in buddy- teams; one guiding (by following the manual) and the other performing the inspection. This also reinforces the learning.
Note
Note
The following elements in Lesson 5 may be covered during the pre-use inspection exercise
ELEMENT 5.3 - STAY IN DANGER ZONE
Learning objectives:
59) The participants can explain the risks of staying in the danger zone when the lift is turned on (Knowledge, Intermediate level) 60) The participants can take the responsibility that no one is in the danger zone when the lift is switched on (Ability, basic level)
The instructor shall:
Design and conduct learning activities where the learning objectives are practised:
a.
risk of staying in the danger zone
b.
clearing the danger zone
Provide feedback on the participants’ professional and human performance during the practical training
The participants shall:
Engage in the practical training moments, take initiative and responsibility, and receive feedback constructively
ELEMENT 5.4 - SAFETY IN THE LIFT TRAVEL RANGE
Learning objectives:
61) The participants can describe the hazards of obstacles in the travel range of the lift (Knowledge, basic level)
62) The participants can take responsibility for making sure that there are no obstacles in the travel range of the lift (Ability, basic level)
Global Wind Organisation©2023 / www.globalwindsafety.org
32 / 171
Made with FlippingBook flipbook maker