79) The participants show interest in ensuring, that the handle strings of the upper and lower hatches are properly installed and have the correct length (Ability, basic level)
The instructor shall:
Demonstrate how to perform a visual inspection of the placement of the pins in the axes of the upper and lower hatches
Demonstrate how to inspect the condition and operation of the magnet system or latch on the upper hatch
Demonstrate and facilitate or lead a discussion on the installation and dimensions of the handle strings of the upper and lower hatches
The participants shall:
Engage in practice, share experiences, and apply the received feedback in following exercises
Conduct a short questionnaire test to recap the theory and safety issues from Lesson 9
Check own answers and solutions from the shown fact list on completion of the test
LIFT OPERATION PANEL/MANOEUVRE PANEL
15 min.
The aim of this lesson is to enable the participants to verify and ensure that the lift operation/ manoeuvre panel is fully operational.
After successfully having completed Lesson 10 of the Lift Commission and Inspection Module:
80) The participants can on own initiative take responsibility of inspecting and testing the lift operation/ manoeuvre panel and require repair when needed according to the relevant manual (Ability, intermediate level)
ELEMENT 10.1 - THE LIFT OPERATION/MANOEUVRE PANEL
Learning objectives: