Technical training
Lift Standard / V3 2023-05-02
9.3
Upper and lower hatches TOTAL
20 min.
10. Lift operation/manoeuvre panel 10.1
The lift operation/ manoeuvre panel
10.2 10.3
Operation hour counter Emergency rescue system TOTAL Suspension/crossbeam Rope end attachments Bolts and bolts connections
20 min.
11. Suspension/crossbeam
11.1 11.2 11.3 11.4 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9
Upper and lower attack pinion (R&P) TOTAL
35 min.
12. Drive and safety wire rope
Drive ropes, in general
Tension weights
Grounding rotating unit
Rope ends
Counter rollers Rope clamps
Rope attachments and bondings
Rope protection
Inspection of the rack
12.10 Grease the rack TOTAL
140 min.
13. Traction hoist
13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8
Traction hoist device Operation hour counter
Labels and type plates in traction hoist
Drive unit, mechanical Drive unit, electrical Upper and lower gearbox
Electro-mechanical and centrifugal brakes
Load capacity system TOTAL
73 min.
14. Wire rope redirection inside the cabin
14.1
Wire rope redirection inside the cabin
TOTAL
15 min.
Global Wind Organisation©2023 / www.globalwindsafety.org
97 / 171
Made with FlippingBook flipbook maker