FW_MTP_Appendices 20260519

Meacham Boulevard Phase II West Blue Mound Road (FM 156) to IH 35W

PROJECT PURPOSE The project will reconstruct and widen the existing roadway from a three-lane undivided to a four-lane divided facility, enhancing freight access, mobility, and safety. PROJECT OVERVIEW Limits : Blue Mound Rd (FM 156) to IH 35W Length : ~1.7 miles Proposed Cross Section: » Two 11’ to 12’ travel lanes in each direction » 16’ raised median » One 10’ shared‑use path on the south side and one 6’ sidewalk on the north side » 144’ right-of-way

2’ 6’ Sidewalk

12’ Lane

11’ Lane

16’ Median

11’ Lane

12’ Lane

5’

10’ SUP

MEACHAM BLVD - TYPICAL SECTION

PROJECT BENEFITS

PROJECT COSTS $44.3 million (with anticipated letting in 3 years)

Accommodate growing transportation demands for both passenger and freight movement. Incorporates updated roadway design to improve safety, resilience and reliability. Includes new drainage systems, roadway lighting, intersection signalization, and shared-use path.

JURISDICTION Council District 2

Precinct 4

PROJECT CONTACT transportation@fortworthtexas.gov

www.movingamillion.org

Made with FlippingBook - professional solution for displaying marketing and sales documents online