Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
Table 2: Class D Construction Cost Estimate for a Spray Park
Pad Area (sq.ft.) 2,000 sq. ft. 1,700 sq. ft.
Unit Rate ($ CAD / sq.ft.)
Total Cost ($ CAD) $680,000 $1,020,000
System Type
Flow-Through Recirculation
$340/sq. ft. $600/sq. ft.
As shown in Table 2, a recirculation system carries a substantial capital cost premium compared with a flow-through system due to its additional pumping, filtration, treatment, and control equipment. The unit rates were developed using a combination of budget quotes provided directly to the District and cost information from recently completed projects in southwestern British Columbia. Based on the information reviewed, overall project pricing for Vortex and Waterplay systems was generally comparable. Manufacturer-specific pricing can be evaluated once the project scope, preferred system, and detailed design have been further developed. In addition to the spray pad and water features, the estimated unit rates include allowances for earthworks, site preparation, grading, and utility service connections that are typically excluded from equipment supplier pricing. A further allowance of 10 percent has been included for basic engineering design, professional oversight, and assurance documentation not included within the supplier's scope. These estimates do not include the construction or renovation of supporting amenities such as washrooms, shade structures, seating areas, or conventional playground equipment that may be developed alongside the spray park.
Capital & Lifecycle Cost Comparison Cost Category
Flow-Through System Recirculation System
Initial construction cost
Lower
Higher
Water and sewer infrastructure Mechanical system complexity
Moderate
Moderate
Lower
Higher
Electrical requirements
Lower
Higher
Long-term maintenance
Lower
Higher
7.2. Operational & Maintenance Costs In addition to the capital investment required to construct a spray park, ongoing operational and maintenance costs were estimated to assess the project's long-term budget implications for the District. These costs primarily fall into three categories: electricity, water and sewer services, and labour. Cost estimates are based on a 120-day operating season from May through August, with the facility operating for 10 hours per day. A fully burdened labour rate of $55 per hour, including wages and benefits, was applied to all staff time estimates. Electricity costs were calculated using the applicable BC Hydro small general service rate, including base connection charges. Water and sewer costs were estimated using the District of Hope's current Fees and Charges Bylaw rates of $0.50/m³ for water and $0.78/m³ for sewer services. Because flow-through and