1. List of Abbreviations | 4 |
2. Terms and Definitions | 4 |
3. Change Log | 5 |
4. Scope | 7 |
5. General Requirements for the GWO Slinger Signaller | 7 |
5.1 Target Group | 7 |
5.2 Aims and Strategic Objectives | 7 |
5.3 Validity Period | 8 |
5.4 Course Codes | 8 |
5.5 Participant Prerequisites for the Slinger Signaller Standard | 8 |
5.6 Instructor Qualification Prerequisites | 8 |
6. General Resources Required to Deliver Slinger Signaller Standard | 8 |
6.1 Instructors | 8 |
7. Using This Standard to Develop Training | 9 |
8. Administration and Certification of Module | 9 |
8.1 Participant Performance Assessment | 9 |
8.2 Theory Test | 9 |
8.3 Participant Assessment Form | 10 |
9. Slinger Signaller Module | 13 |
9.1 Aims and Objectives for the Slinger Signaller Module | 13 |
9.2 Duration of the Slinger Signaller Module | 14 |
9.3 Slinger Signaller Module Participant Ratio | 14 |
9.4 Slinger Signaller Module Timetable | 14 |
9.5 Detailed Description of the Slinger Signaller Module | 16 |
Lesson 1 - Introduction to the Training | 16 |
ELEMENT 1.1 - Safety instructions and emergency procedures | 16 |
ELEMENT 1.2 - Facilities | 17 |
ELEMENT 1.3 - Introduction | 17 |
ELEMENT 1.4 - Scope and Main Learning Objectives | 18 |
ELEMENT 1.5 - Ongoing Assessments (Performance Assessment Form) | 18 |
ELEMENT 1.6 - Motivation | 19 |
ELEMENT 1.7 - Human Factors | 19 |
ELEMENT 1.8 - Personal Protection Equipment | 21 |
Lesson 2 - General theory | 21 |
ELEMENT 2.1 - Role and Basic Signals | 22 |
ELEMENT 2.2 - Legislation | 22 |
ELEMENT 2.3 - Lifting Equipment Types | 23 |
ELEMENT 2.4 - Accessories | 24 |
ELEMENT 2.5 - Dynamic or Static | 25 |
ELEMENT 2.6 - Lift Plans | 25 |
ELEMENT 2.7 - Risk Assessment | 26 |
Lesson 3 - Practical | 27 |
ELEMENT 3.1 - Manual Handling | 27 |
ELEMENT 3.2 - Slings | 28 |
ELEMENT 3.3 - Shackles | 29 |
ELEMENT 3.4 - Lifting Bags | 30 |
ELEMENT 3.5 - Load Attachment Point Types | 30 |
ELEMENT 3.6 - Accessory Storage | 31 |
ELEMENT 3.7 - Pre/Post-Use Check | 32 |
ELEMENT 3.8 - Quarantine | 32 |
ELEMENT 3.9 - Crane Functions | 33 |
ELEMENT 3.10 - Load Orientation DeVices | 34 |
ELEMENT 3.11 - Lifting Angles | 34 |
ELEMENT 3.12 - Centre of Gravity (COG) | 35 |
ELEMENT 3.13 - Suspended Loads and Dropped Objects | 36 |
ELEMENT 3.14 - Lifting Zones | 37 |
ELEMENT 3.15 - Roles and Responsibilities | 37 |
ELEMENT 3.16 - Toolbox Talk | 38 |
ELEMENT 3.17 - Hand/Radio Signals | 39 |
ELEMENT 3.18 - Slinging Techniques | 40 |
Lesson 4 - Training review | 40 |
ELEMENT 4.1 - Training review | 40 |
ELEMENT 4.2 - Feedback Session | 41 |
ELEMENT 4.3 - Theory Test | 41 |
Annex 1 - Communication | 43 |
Annex 2 - Examples of Sample Lift Plans | 48 |
Annex 3 - Equipment List | 61 |
Annex 4 - Version History | 64 |
Made with FlippingBook Annual report maker