Every day 90 million m3 of water is lost globally due to treated water leakages
Protecting People Part 1; Wasting Fresh Water, Stopping Systemic Failures
1
Agenda
Introduction Simple Scenario Water Losses Leaks and Leak Detection
Different Thinking Life Cycle Costing Summary Q&A
2
Introduction
Every day 90 million m 3 of water is lost globally due to treated water leakages
Data Source; un.org/waterforlifedecade
Introduction
This equates to 36,000 Olympic-sized swimming pools of water loss each day - enough water to sustain 400 million people
Data Source; un.org/waterforlifedecade
Introduction Water is a precious and scarce resource
…. but do we really consider it in this way?
If we have water each and every time we demand it …. …. do we stop and think about all the water that never reaches us?
Furthermore, 50% of heavily water-reliant global industries …. …. are located in geographical areas designated high water-stress risk – Climate change will only exacerbate these industry risks
Data Source; CDP 2019
5
Introduction; World Water Day; 22 March 2020
The impact of climate change is felt throughout the water cycle The increasing severity and frequency of droughts and floods – Has a detrimental effect on people’s livelihoods and well-being Demand for water is set to increase by 55% by 2050 – By which time around 40% of the world’s population are projected to be living in water-stressed river basins. Strong action on water must go hand in hand …. – …. with strong action on climate change. Building a better water and climate future requires collective efforts – that go beyond specific policy communities or individual countries’ actions We must join forces, now Statement from the Secretary-General of the OECD, Angel Gurría
6
Simple Scenario
7
Simple Scenario Let’s consider filling your family car with fuel If you use for example 100 Euros of fuel each and every week If 30 Euros of that fuel spilled onto the highways – Due to a leak in your fuel tank Would you just allow that to happen and do nothing ?? – If that continued for 52 weeks, then you have lost 1560 Euros of fuel So of course …. the answer is “No!!”
…. but this is what happens to our water supplies – Around 30% of water is treated and never makes it to the point of usage
Data Source; OECD 2016, IWA 2018
8
Simple scenario
Treated water leakages cost water utilities (and therefore consumers) an estimated $14 billion a year
Data Source; OECD 2016
Water Losses
A hidden problem?
10
Treated Water Leakage Rates; Major Cities
Data Source; OECD 2016
70%
60%
50%
40%
30%
World class level
20%
10%
0%
11
Water Leakage Rates vs GDP per Capita
Data Source; OECD 2016
70%
Tuxtla
60%
Edinburgh
San Luis Potosi
50%
Rome
Bologna
Chihuahua
Mexico City Naples
40%
Glasgow
World class level
Oslo
30%
Montreal
Grenoble Athens
Stockholm
20%
Prague
Malaga
Liverpool
Calgary
Acapulco
Budapest
Marseille
Milan
10%
Lisbon
Paris
Cologne
Amsterdam
NYC
Tokyo
0%
Seoul
0
10000
20000
30000
40000
50000
60000
70000
80000
GDP expressed in USD per Capita
12
Plastic Pipework is not as Resilient as You Expect Material degradation shows visible results after around 15 years in service
Data Source; ISSF 2015
13
Joints in all Pipework Systems are Weak Points
90% of leaks occur at joints
Data Source; ISSF 2015
14
Working with Dissimilar Metals Encourages Leaks
Dissimilar metals in contact promote galvanic corrosion
Data Source; ISSF 2020
15
Water Losses; Summary Currently we install water supply system based on designs that will fail – This is not as a result of any poor installation practices We generally don’t select the best material choice for the pipework – We are largely guided by material acquisition costs We bury pipework underground, so we hide the future failures – This creates challenges for leak detection and repairs We frequently select material that …. – Creates micro-particulate contaminants in the pipework – Is porous to hydrocarbons like diesel oil Whilst there are several reasons for water leakages …. …. joints in pipework systems are the overriding weak point
16
17
Leak Detection and Repair is Big Business There are many devices that can detect leaks in pipework There are many methods to repair leaking pipes
…. but do we really believe this is the right way to operate? Leaks are inevitable …. or are they ?
Consider a vascular surgeon ….
…. he has one opportunity to deliver a reliable fix
If we select the most appropriate materials, we can minimize leaks …. or perhaps even eliminate them
18
Detecting Leaks is Important …. but What is easier to manage? – 125 leaks per day or just 25 leaks per day? 125 leaks per day just forces firefighting as a mode of operation – Every day is chaotic and the pressure never goes away Why would we choose to operate like this? – Business norms – Acceptability of the apparently inevitable – Short-termism …. contract culture – Traditional thinking – We never get to look up and look around …. because we’re just too busy If we had a blank piece of paper …. what would we choose to do?
19
Eliminating Leaks If we want to eliminate leaks, we must have a different start point What is the primary mode of failure today? Can we eliminate or significantly reduce that mode of failure? What is the most appropriate solution to deliver zero leaks? What are the benefits of that solution? What are the weaknesses of that solution? Can we effectively minimize the weaknesses through …. – Material selection – Material processing – Easy to work with material
20
Eliminating Leaks; Thought Process Map
Can we eliminate / reduce the fittings?
At the fittings in the last meters of pipework
Identify where most leaks occur
Yes
Could we bend the pipes on-site by hand?
It depends on the material and pipe forming process
Yes
Develop bendable pipes
What is the best material for this type of pipe?
Hydroformed corrugated pipes can be bent by hand (even metals / alloys)
Stainless steel; strong, lightweight, corrosion resistant, multiple bending is possible
21
Leaks & Leak Detection; Summary Leak detection and repair has become the norm Almost one third of our treated water doesn’t make it …. …. to the point of usage – Global average for urban environments This approach creates significant GHG emissions If we can think differently, why do we choose not to? It is important to note that leaks from metal and alloy pipework …. …. are much easier to detect because they emit sound
Data Source; IWA 2020
22
Different Thinking; A water leakage solution that lasts more than 100 years
Different Thinking; Sustain our World with Stainless
We have some lighthouse cities Who have made the stainless switch – For their water supply systems Tokyo, Japan Seoul, South Korea Taipei, Taiwan
It’s all about fit and forget
24
Different Thinking; Why Choose Stainless It is highly corrosion resistant and doesn’t impart metallic tastes – The corrosion resistant ‘passive film’ is self repairing if damaged It doesn’t promote bacteria or residues in the pipework It will last for at least 100 years without the need for replacement Easy-to-bend part-corrugated pipes can be produced – Simplifies and speeds up the installation process Installation programs can be phased over time – And the benefits are realized immediately It will massively reduce maintenance costs It can be fully and easily recycled at the end of life
25
Comparison of Water Losses
Data Source; ISSF 2020
Traditional Water Supply Systems
Stainless Steel Water Supply Systems
100
100
80
80
60
60
40
40
20
20
0
0
Property Usage into Sewers
Property Usage into Sewers
Property Usage into Aquifers
Property Usage into Aquifers
Reservoir Treatment Trunk Supply
Last Metre Supply
Reservoir Treatment Trunk Supply
Last Metre Supply
Available Losses Usage
Available Losses Usage
26
Reference City 1; Tokyo, Japan
0 10 20 30 40 50 60 70 80 90 100 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 % Stainless % Repairs % Leakages 70k repairs per annum 10k repairs per annum Data Source; ISSF 2015
27
Reference City 2; Seoul, South Korea
0 10 20 30 40 50 60 70 80 90 100
45k repairs per annum
10k repairs per annum
% Stainless % Repairs % Leakages
28 Data Source; ISSF 2015
Comparison; Tokyo and Seoul Feature Tokyo, Japan
Seoul, South Korea
Comments
Initial leakage rate Final leakage rate
15.4%
260m m 3 pa 33m m 3 pa
27.3%
502m m 3 pa 29m m 3 pa
2.1%
2.5%
Initial repairs per annum Final repairs per annum Stainless grade selected
70k 10k
45k 125 – 190 repairs per day
10k
25 repairs per day
316 (17Cr, 11Ni, 2Mo)
304 (18Cr, 9Ni) Soil chemistry difference
Financial savings
4,0bn USD over 34 years 4,7bn USD over 27 years Based on 1 USD per m 3
Water production per capita CO 2 Emissions Reduction
205 m 3 to 117 m 3
168 m 3 to 113 m 3
Annual rate
54k tons pa
110k tons pa Electricity reduction
Pipework
All stainless corrugated All stainless corrugated
Remaining fittings Residues in pipework
All stainless None evident
All stainless Vital to avoid leakages
None evident
Unlike plastic pipework
Timescale to 90% stainless
20 years
21 years
Additional Benefits
Proven resistance to seismic shocks (9 RS)
40% reduction in water treatment plants
29 Data Source; ISSF 2015
Accommodating Less Rainfall; The Taipei Experience Year Annual Rainfall Reservoir Storage Stainless Proportion
Network Leakages
Annual Water Supply
2002 2008 2014
1377mm 58% of capacity 1296mm 73% of capacity 1201mm 92% of capacity -176mm +34% of capacity
0%
28.4% 8.8m m 3 23.2% 8.0m m 3 16.7% 7.0m m 3 -11.7% -1.8m m 3
19% 35%
Variances
• Prior to 2002 Taipei had disruptions to the city water supply each year • Water levels in reservoirs had become dangerously low • A targeted introduction of stainless supply lines resulted in; • A reduction in leakages
• An increased availability of water in reservoirs • A reduction in overall annual water supply
Data Source; Taipei Water Department 2015
30
Headline Guidance Numbers
Headline Indicator
Value
Comments
Installation Cost per 100k of Population
Around 80m USD Based on Tokyo and Seoul experiences
Break-Even (B/E) Installation Proportion
45% Proportion of stainless service pipework out of total service pipework
Typical Time to Deliver B/E Proportion Annual Saving for each 1% Stainless Proportion Above B/E Annual Saving at 90% Stainless Service Pipework
10 years
150m USD
6.8bn USD
The above data is for guidance only. Every city is a different in terms of; • Starting treated water losses • Starting water loss profile …. loss locations, loss types, repair capability • Available reservoir stocks and annual variations
31
Different Thinking; Summary Stainless steels provide a compelling alternative – When compared traditional water pipework materials
Three major cities have switched to stainless with stunning results – That comfortably accommodate seismic disruption and falling rainfall levels Can we accept that 30% of our treated water never makes it …. – …. to the point of usage …. when water is such a scarce resource The financial savings are compelling The elimination of GHG emissions are equally compelling
What is not to like about stainless steels? Material cost??
32
Life Cycle Costing
Life Cycle Costing Life cycle costing (LCC) supports sustainable thinking – It avoids the ongoing cost trap of “lowest cost bids win contracts” …. …. and maintenance is for someone else LCC also allows us to really think long term – We can consider service lives of >100 years for some fundamental needs Water supply systems Infrastructure projects Coastal structures to protect land – We can also consider materials that we may have previously discounted Life cycle thinking positively supports GHG reduction – Around 9% of global GHG emissions results from road traffic – 1% of that 9% is due to standing traffic around infrastructure repair points
34
The Components of Life Cycle Costing Material acquisition costs (Acq) – Cost of securing the materials / products for a specific project / installation – Includes delivery to the installation site Installation costs (Inst) – Costs of installing the materials / products to provide an operational concept Ongoing maintenance costs (Maint) – Ongoing costs of maintaining the installation to deliver an acceptable operation Income from sales or end-of-life recycling (Inc) – Cash from sales associated with the concept or at the end of operational life The first 3 elements really apply to water supply systems
35
Life Cycle Costing
Best available material for less Life Cycle Cost (Assumes 100- years service life) Stainless Steel $2,175
$3,340
Polyethylene
$3,690
PVC
Costs are per 4m installation (from main supply to the property)
Data Source; ISSF & The Ministry of the Environment, Republic of South Korea 2020
Life Cycle Costing (Based on 100 years)
1000 1500 2000 2500 3000 3500 4000
0 500
Acq
Inst
Maint
Acq
Inst
Maint
Acq
Inst
Maint
Polyethylene
Stainless Steel
PVC
Data Source; ISSF & The Ministry of the Environment, Republic of South Korea 2020
37
Bypassing LCC Thinking Some common reasons given include …. “It’s hard to get all the comparative data” – It’s a little harder but once you have it you don’t have keep renewing it “It’s difficult to understand” – Some people make it difficult to understand, but the concept is really easy “My boss doesn’t believe in LCC” – Every day presents an opportunity to educate someone …. seize the day “Our current solution works and we know what we are doing” – Good companies go bad, because their previous successes blind them – Do you want to be a follower or a market leader? “My client is not demanding LCC”
38
LCC; Summary We need to lose our myopia and think holistically We need to ‘think LCC’ for all new projects and installations ‘LCC thinking’ will …. – Dispel some urban myths – Show where the majority of the money goes …. from ‘cradle to grave’ – Provide information to make clear judgements and decisions
39
Overall Summary
Water is a scarce and precious resource Climate change is adversely impacting on our water cycle We must act together to use water wisely We need to move away from short term thinking – For our water supply systems We must use a water delivery system that is reliable and resilient We need to think differently and without myopia We should ‘think stainless’
>>100m USD per annum of financial savings should be compelling – Based on large city experiences
40
Closing Words “As we expected, Stainless Steel pipes have contributed to cleaner water quality and longer service life than other materials. Furthermore, the corrugated sections contributed to an improved workability and a decrease in leakage”
Kim Hyen Ton , Director of the Water Distribution Department, Seoul Water Works
Thank you for your attention. Any questions?
42
References Slides 3 & 4; http://www.un.org/waterforlifedecade/swm Slide 5; Melting Point Report, CDP Global, July 2019 Slide 6; World Water Day 2020 statement, OECD, Angel Gurria, March 2020 Slide 8; OECD, 2016 and IWA, 2018 Slide 9; OECD, 2016
Slides 11 & 12; OECD, 2016 Slides 13 & 14; ISSF, 2015
Slide 15; ISSF, 2020 Slide 22; IWA, 2020 Slide 26; ISSF, 2020 Slides 27, 28 & 29; ISSF, 2015 Slide 30; Taipei Water Department, 2015 Slides 36 & 37; ISSF and Ministry of the Environment, Republic of South Korea, 2020 Slide 41; Director of the Water Distribution Department, Seoul Water Works, Republic of South Korea, 2015
43
Appendices
44
Leakages; Water Pressure & Leak Hole Size
Water Pressure (bar)
Leak Hole Size (mm)
Loss in m 3 per day
Loss in m 3 per year
2 4 8 2 4 8 2 4 8 2 4 8
10.0 39.0
3650
14230 52580
10.0
144.0
7.0
2550 9490
26.0
6.0
101.0
36880
4.6
1650 6190
17.2 69.1
3.0
24870
2.5
900
10.0 38.8
3600
1.5
13968
45
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45Made with FlippingBook - professional solution for displaying marketing and sales documents online