1. About This Guide | 5 |
1.1 Purpose | 5 |
1.2 Scope | 5 |
1.3 Audience | 5 |
1.4 Prerequisites | 5 |
1.5 Conventions | 5 |
1.6 Warranty | 6 |
1.7 Disclaimer of Liabilities | 6 |
1.8 Copyright and Trademark Information | 6 |
1.9 Related Production Information | 6 |
2. Environmental and Safety Information | 9 |
2.1 Environmental Conditions | 9 |
2.2 Safety Considerations | 9 |
3. The AVR400 System | 13 |
3.1 Overview | 13 |
3.2 Features and Capabilities | 13 |
3.3 AVR Configurations and Options | 14 |
3.4 AVR System Components | 15 |
3.4.1 X-Y Stage | 15 |
3.4.2 Z-Column | 15 |
3.4.3 Motorized Z-Track | 15 |
3.4.4 MetLogix M3 Metrology Software | 16 |
3.4.5 Lens Options | 17 |
3.4.6 Lighting Control | 17 |
3.4.7 Touch Probe Option | 18 |
3.4.8 Rotary Stage Option | 19 |
3.4.9 Operator Controls and Interfaces | 20 |
3.4.10 Workstation | 21 |
4. System Specifications | 23 |
4.1 Performance Specifications | 23 |
4.2 Hardware and Mechanical Specifications | 23 |
4.3 Electrical Specifications | 24 |
4.3.1 Electrical Power | 24 |
4.4 Optical Specifications | 25 |
4.5 Computer and Software Specifications | 26 |
4.6 Touch Probe Specifications | 26 |
4.7 Rotary Stage Specifications | 27 |
4.8 Workstation Specifications | 29 |
5. Installation and Setup | 31 |
5.1 Planning the Placement of Equipment | 31 |
5.2 Moving the Crated System | 31 |
5.3 Uncrating and Moving the System | 32 |
5.4 Removing Shipping Locks | 33 |
5.5 Setting Up the System | 35 |
5.6 On-Site Installation, Calibration and Training | 36 |
5.6.1 Contacting Starrett Kinemetric Technical Support | 37 |
6. System Operations | 39 |
6.1 Powering On the System | 39 |
6.2 Manually Controlling the System | 40 |
6.3 Verifying Basic M3 Software Operations | 42 |
6.4 Operating the Workstation | 42 |
6.5 Fixturing Parts | 43 |
6.6 Accessing System Electronics | 43 |
7. Understanding Measurement Strategy | 45 |
7.1 Zoom Optics Measurement Strategy | 45 |
7.2 Telecentric Lens Measurement Strategy | 45 |
7.3 Illumination Strategy | 46 |
7.4 Focus Strategy | 46 |
7.5 Verifying the Setup of the System | 46 |
8. Maintaining the System | 49 |
8.1 Performing Daily Inspections | 49 |
8.2 Weekly Inspections | 49 |
8.3 Monthly Zoom Optics Alignment Verification | 49 |
8.3.1 Zoom Optics Parfocality and Focus | 50 |
8.3.2 Zoom Optics Parcentricity | 50 |
8.3.3 Zoom Optics Squareness | 51 |
8.4 Monthly Calibration Verification | 52 |
8.5 Cleaning | 53 |
8.5.1 Cleaning External Surfaces | 54 |
8.5.2 Cleaning Optics | 54 |
8.5.3 Cleaning Critical Mechanical Parts | 54 |
8.6 Spare Parts and Accessories | 55 |
9. Glossary | 57 |
Made with FlippingBook - professional solution for displaying marketing and sales documents online