Wake County Hazard Mitigation Plan

SECTION 7: MITIGATION ACTION PLANS

City of Raleigh

Potential Funding Sources

Action #

Hazard(s) Addressed

Relative Priority

Lead Agency/ Department

Implementation Schedule

Description

Goal

Objective

Estimated Cost

2019 Status

Status Comments/Explanation

To further this initiative, the city is cataloging potential candidates for elevation based on our current repetitive loss list. Staff has developed a scoring system based on cost benefit for elevation that would compare the projects to relocation and retrofits.

Develop an ongoing program designed to utilize Federal grant resources to assist private property owners in elevating existing structures located within flood hazard zones. (CRS 510/530) Develop an ongoing program designed to utilize Federal grant resources to assist private property owners in renovating and retrofitting existing structures in flood hazard zones to reduce vulnerability to flooding damage.

Raleigh Engineering Services

In-Progress – Carry Forward

PP-2

3

2

Flood

Moderate

$100,000 - $1m

Local, Federal

3-5 years

City staff evaluates potential candidates and approaches property owners for mitigation help.

Raleigh Engineering Services

Ongoing – next 5 years

In-Progress – Carry Forward

PP-3

3

2

Flood

Moderate

$100,000 - $1m

Local, Federal

We now have emergency backup power generators at all our critical facilities except for our South Raleigh Operations Facility. However, we can relocate supplies, material and teams to any of our other facilities per our emergency operational planning. Also, per our Hurricane Florence AAR we are conducting emergency fuel capacity studies for our generators at our largest wastewater treatment plant and both our water treatment plants. A fuel truck is not in the works but we have emergency fuel contracts with Red Star and also exploring dual use of natural gas to power some of our energy resiliency to give us an added layer.

Program to install emergency electrical generators at all public utility facilities. Current focus on redundant generators at critical facilities, second fuel truck and completion of 100% generator coverage in Garner area.

In-Progress – Carry Forward

PP-4

3

1

All

High

Raleigh Public Utilities

$100,000 - $1m

Local

2-3 years

Structural Projects

Install cameras in flood prone areas throughout the City of Raleigh to allow us to view these locations and make informed decisions as it relates to flooding

City of Raleigh Transportation

SP-1

2

2

Flood, Hurricane

Moderate

$100,000 to $1m

Unknown

3-5 years

New

N/A

Emergency Services

We continually look at our technical rescue capabilities and adjust as needed. The initiative to add 1 Heavy Rescue and 2 Squads has been completed. Additionally, we’ve added 1 company (12 personnel) to the team, upgraded water rescue equipment, increased water rescue certified personnel from 20 to 60, required 100% of members be Technical Rescuer and Vehicle Extrication certified and are working toward 100% certification for all members in all the other technical rescue disciplines.

Dam Failure, Flood, Hurricane, Severe Weather, Severe Winter Storm, Tornado, Wildfire Hurricane, Severe Weather, Severe Winter Storm, Tornado

Provide and enhance technical rescue capabilities more equitably throughout the City.

In-Progress – Carry Forward

ES-1

2

1

High

Raleigh Fire

$100,000 - $1m

Local

2-3 years

Provide after-action report of emergency response to severe weather events in order to improve planning for future disasters. Maintain a standard operating guideline to direct operational planning prior to anticipated weather emergencies.

Raleigh Fire and Emergency Management Raleigh Fire and Emergency Management

After-action report made for Hurricane Florence and will continue to be made for all subsequent weather events.

Ongoing- Post Event

In-Progress – Carry Forward

ES-2

2

2

High

$100,000 - $1m

Local

The City's Emergency Operation Plan outlines our standard operating guidelines and has been adopted as an official document used prior to and during weather emergencies. The IT Department led a citywide effort to develop a Situational Analysis Smart Dashboard for the Emergency Operations Center and refined it in real time as new types of data, such as current wind speed, were identified as critical to the safety of the public and city workers during an emergency. The Smart Dashboard was first deployed for Hurricane Florence. The dashboard is cross-departmental, with real-time progress tracking, covering a range of emergency management issues from debris in streets and closures, malfunctioning traffic signals, flood monitoring and 911 call data.

Ongoing – next 5 years

In-Progress – Carry Forward

ES-3

2

1

All

High

$100,000 - $1m

Local

Design GIS programming capable of providing real-time data to emergency managers and historic data for future emergency response planning.

Raleigh City Manager and Information Technology

In-Progress – Carry Forward

ES-4

2

2

All

High

$100,000 - $1m

Local

3-5 year

Wake County Multi-Jurisdictional Hazard Mitigation Plan 2019

234

Made with FlippingBook interactive PDF creator