Select Mesh Railing Installation Instructions

Professional Trex Select® horizontal mesh railing installation instructions with 14 pages of detailed guidance.

TREX SELECT ® COMPOSITE HORIZONTAL MESH RAILING Installation Instructions

IMPORTANT–IF INSTALLING TREX LIGHTING, SCAN QR CODE TO OBTAIN RAILING & LIGHTING INSTRUCTIONS / DO NOT USE INSTRUCTIONS BELOW. FAILURE TO DO THIS WILL RESULT IN IMPROPER RAILING AND LIGHTING INSTALLATION!

NOTES: » T REX SELECT RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED. » A LL TREX SELECT RAILING LENGTHS ARE MANUFACTURED AT CLEAR SPAN DIMENSIONS (SPANNING BETWEEN SPACE OF POSTS): 72" FOR 6' CLEAR SPAN AND 96" FOR 8' CLEAR SPAN. NOTE THAT RAILINGS ARE DESIGNED TO BE SLIGHTLY LONGER THAN REQUIRED TO ALLOW FOR VERY SLIGHT PLAY IN POST PLACEMENT. TRIMMING MAY BE REQUIRED. IT IS VERY IMPORTANT TO MEASURE FIRST. » IF INSTALLING RAILING OVER 6', THE TREX ALUMINUM RAIL STIFFENER MUST BE USED TO MEET CODE REQUIREMENTS. » TREX ALUMINUM RAIL STIFFENER IS NOT INCLUDED IN 8' HORIZONTAL KITS. » T OP AND BOTTOM RAIL PROFILES ARE IDENTICAL, HOWEVER TOP RAIL MUST BE POSITIONED IN THE HORIZONTAL POSITION. » S EE BELOW FOR BOTTOM RAIL PLACEMENT AND RAIL HEIGHTS DEPENDING ON HOW BOTTOM RAIL IS INSTALLED.

Care and Cleaning Maintaining the appearance of your Trex Select railing is important. Occasional washing is recommended. Over time your railing may show signs of weathering as a result of exposure to the elements. The frequency of cleaning will depend on the environment and exposure to various types of elements. » F or detailed cleaning recommendations, please refer to the Trex Railing Care and Cleaning guide found on www.trex.com.

L

PARTS

F *

C

A

I K

A1

C2

C

A2

L

H **

W

D

C1

J

I K

G *

E

B

N

B

MESH DIMENSIONS CHART Carbon Steel–Black

P

36" x 6' 36" x 8'

36" 36" 72"

72" 96" 60"

4" 4"

Note: Top and bottom rail profiles are identical .

O

72" x 60" 4" IMPORTANT NOTE: ALL MESH PANELS WILL HAVE TO BE CUT, SEE DETAILED INSTRUCTIONS REGARDING PROPER CUT SIZES

Q

CHOOSE YOUR BOTTOM RAIL ORIENTATION Orientation 36"

44"

NOTES: »  Ensure pressure-treated posts are installed at proper heights. If installing 44" railing, use longer post sleeves and measure accordingly to ensure a proper cut. » *See specific installation instructions for attachment of Trex post mounts or Trex Joist Mount Posts prior to installing any railing

Vertical Top Rail Height

37-7/16" 45-5/16"

Horizontal Top Rail Height

36-11/16" 44-9/16"

A1. Top rail A2. Top Rail with Stiffener (for over 72" installation–not included) B. Bottom Rail C1. Bottom Brackets

K. Top and Bottom Anti-Rattle Gaskets L. Side Anti-Rattle Gaskets M. Mesh Caps (not shown above) N. Trex Decking O. Trex Fascia P. Code-approved Wood Joist – 2 x 8 Q. Code-approved Wood Rim Joist – 2 x 8 or Larger *Item not included in the railing kits. Note when using the Select post sleeve, the cap and skirt are included with this post sleeve. **All post sleeves are designed to fit over 4 x 4 pressure-treated post.

C3

C5

C2. Top Brackets D. Mesh Panel E. Adjustable foot block

#8-18 x 1" Bottom Bracket to Rail screw

C4

C6

#9-16 x 1-3/4" Top Bracket to Wood /Post Sleeve screw

F. Post sleeve cap* G. Post sleeve skirt* H. Post sleeve**

#8-18 x 1-1/4" Top Bracket to Rail screw, Channel Attachment screw

> All-in-One Post Sleeve > 4 x 4 post sleeve > 6 x 6 post sleeve I. Top and Bottom Channels J. Vertical Channels

#9-16 x 2" Bottom Bracket to Wood/Post Sleeve screw

1

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726 SMHR-0726

TREX SELECT ® COMPOSITE HORIZONTAL MESH RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL MESH RAILING TREX SELECT ®

3b

Read all instructions BEFORE installation.

3b.Cut railing at marked locations.

IMPORTANT: Post sleeves are NO T to be cut for this design style. Installing Pressure-Treated Posts 1.   PLEASE REFER TO LOCAL BUILDING CODE REQUIREMENTS PRIOR TO ATTACHING PRESSURE TREATED POSTS. » P osts are to be installed 6' or 8' clear span to accommodate appropriate railing length. NOTE: Smaller spans are allowed.

NOTE: For any rail lengths over 6' AND when using aluminum rail stiffener, remove this from the top rail and cut the stiffener 4" shorter than the top rail cut length.

Top Rail

2a

Installing Post Sleeve Skirts and Post Sleeves 2a. If using All-in-One or 6 x 6 post sleeve and one-piece skirt, slide post sleeve skirt over post and down to rest on decking surface.

4"

IMPORTANT NOTE REGARDING FOOT BLOCK INSTALLATION: » Refer to detailed instructions (Trex Select rail instructions) included with foot block prior to installation of

Slide post sleeve over post and position inside post sleeve skirt.

railing section as these include other required steps for proper installation.

2b

Attaching Foot Block to Bottom Rail and Adding Weep Holes 4a. Invert the bottom rail.

4a

2b. If using a 4 x 4 post sleeve and a two-piece skirt, slide post sleeve over post and down to rest on decking surface. Snap two piece skirt over post sleeve. NOTE: Shims can be used to plumb post sleeves. Cutting Railings (if required) 3a. Position bottom and

Center and drill a hole using a 3/16" drill bit. This will be location for foot block attachment (to be installed last).

2

4b. Keeping bottom rail inverted, Use same drill bit, center and drill weep holes through bottom rail at 4 evenly spanned locations to allow for water drainage.

3a

Attaching Bottom Brackets to Bottom Rails 5. Position brackets on each end of BOTTOM RAIL. Attach brackets

5

top rails between posts and mark rails at post locations.

Bottom Rail

NOTE: Ensure posts are plumb before marking rails.

using three #8-18 x 1" self-drilling screws (provided) .

NOTE: For ease of bracket attachment place rail against stationary flat vertical surface along with bracket.

2

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726

HOW TO INSTALL HORIZONTAL MESH RAILING/ CONTINUED TREX SELECT ®

Measuring and Cutting Top and Bottom Channels (when required)

6a.Using scrap material cut at least three support blocks at 3 3/4 " in height. Place one each on decking surface beside each post and one near center of span.

6a

9

3 3/4"

6b.Sit bottom rail on

6b

support blocks, center on posts, and install bottom brackets on each

post using two #9-16 x 2" wood screws (C6). If using a 6x6 post sleeve use two #9-16 x 2 1/2" screws (not provided). NOTE: screws go in at slight angle.

IMPORTANT NOTE: SET DRILL TO LOW SPEED AND LOW CLUTCH SETTING WHEN INSTALLING THESE SCREWS. DO NOT USE IMPACT DRIVER. Attaching Foot Block 7. .Attach foot block per foot block instructions. Cutting (when required) and Installing Vertical Channels 8a. F or 36" rail, measure and cut vertical channels to 28 3/4". For 44" rail, vertical channels will not require cutting.

9.  Measure distance between vertical channels, and cut top and bottom channels to this length.

Install Bottom Channels

10

6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

8b

8b. Place vertical channels on bottom rail centered between posts, and attach screws into channel using three #8-18 x 1 1/4" self-drilling screws (C4). Install lower and uppers screws approximately 1" from each end of vertical channel. Center and install remaining screws.

10. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (C4) , minimum four screws for 6' section and minimum five screws for 8' section.

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726

TREX SELECT ® COMPOSITE HORIZONTAL MESH RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL MESH RAILING/ CONTINUED TREX SELECT ®

Measuring and Cutting Anti-Rattle Gaskets 11a. For 36" rail, measure, and cut side anti-rattle gaskets to 27". For 44" rail, side anti- rattle gaskets will not require cutting.

12c

11b

11b. F or top and bottom anti-rattle gaskets, using same measurement from top/bottom channels ( see step 9 ), add 1" and cut top and bottom anti-rattle gaskets to this measurement.

12c. C UTTING MESH WIDTH (REQUIRED FOR ANY SPAN) : For width, measure distance between posts and subtract 1", and cut mesh to length calculated.

Cutting Mesh

12a

Installing Mesh Caps

13

Retain bottom edge of mesh panel

12a. W HEN INSTALLING 36" AT FULL SPAN : For 36" rail, cut the top two rows of the mesh. DO NOT CUT BOTTOM OF MESH PANEL . NOTE: An angle grinder (with proper blade) is recommended for cutting wire mesh. (ALWAYS USE PROPER SAFETY GEAR WHEN CUTTING WITH ANGLE GRINDER.) Note that heavy duty bolt cutters can also be used.

13. P lace mesh caps on all cut ends of mesh for corrosion protection.

12b. W HEN INSTALLING 44" rail , mesh will not require cutting.

4

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726

HOW TO INSTALL HORIZONTAL MESH RAILING/ CONTINUED TREX SELECT ®

Installing Anti-Rattle Gaskets onto Mesh

Attaching Top Brackets on Top Rail

15

14a

15. C enter top brackets on each end of TOP RAIL. Attach bracket using three #8-18 x 1 1/14" self- drilling screws (C4) . NOTE: For ease of bracket attachment place rail against stationary flat vertical surface along with bracket.

Installing Top Channel to Top Rail

16 6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

14a. .Install top and bottom gaskets onto top and bottom of mesh panel. Make sure gaskets are centered and fully seated onto mesh.

14b

16. Center top channel in between slots in bracket, also centering on rail (NOTE: there will be a slight gap on each end between brackets and channel), and install using #8-18 x 1 1/4" self-drilling screws (C4): Using a minimum four screws for 6' section and minimum five screws for 8' section.

14b. Install side anti-rattle gaskets. Ensure gaskets are full seated.

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726

TREX SELECT ® COMPOSITE HORIZONTAL MESH RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL MESH RAILING/ CONTINUED TREX SELECT ®

Installing Mesh Panel

Installing Top Rail onto Mesh Panel

18

17

18. .Place top rail assembly onto mesh rail, pressing d own top rail until brackets fully rest on side channels.

17. Slide mesh panel down into side channels/side anti- rattle gaskets and fully seat into bottom channel/ anti-rattle gaskets. IMPORTANT NOTES: »  ENSURE THAT THE NON-CUT SIDE OF THE MESH PANEL IS PLACED IN THE BOTTOM CHANNEL. » IF NECESSARY USE SOAPY WATER ON THE VERTICAL ANTI-RATTLE GASKETS TO ALLOW MESH PANEL TO SLIDE DOWN MORE EASILY.

NOTE: Use a rubber mallet if required to fully seat top rail.

19

19. S ecure top bracket to post using two wood #9-16 x 1 3/4" screws (C5). IMPORTANT NOTE: SET DRILL TO LOW SPEED AND LOW CLUTCH SETTING WHEN INSTALLING THESE SCREWS. DO NOT USE IMPACT DRIVER. Attaching Post Caps 20. S ecure post caps with silicone or PVC adhesive (apply

20

adhesive on the inside self-centering/ corner tabs).

NOTE: Clean up any excess adhesive before it dries .

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMHR-0726

TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions

IMPORTANT–IF INSTALLING TREX LIGHTING, SCAN QR CODE TO OBTAIN RAILING & LIGHTING INSTRUCTIONS / DO NOT USE INSTRUCTIONS BELOW. FAILURE TO DO THIS WILL RESULT IN IMPROPER RAILING AND LIGHTING INSTALLATION!

NOTES: » T REX SELECT RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED. » IF INSTALLING STAIR RAILING OVER 6', THE TREX ALUMINUM RAIL STIFFENER MUST BE USED TO MEET CODE REQUIREMENTS. » Trex Aluminum Rail Stiffener is not included in 8' horizontal kits. Care and Cleaning Maintaining the appearance of your Trex Select railing is important. Occasional washing is recommended. Over time your railing may show signs of weathering as a result of exposure to the elements. The frequency of cleaning will depend on the environment and exposure to various types of elements. » F or detailed cleaning recommendations, please refer to the Trex Railing Care and Cleaning guide found on www.trex.com.

TOOLS NEEDED

Angle grinder

Heavy duty bolt cutters

MESH DIMENSIONS CHART Carbon Steel – Black A B

A

C

36" x 6' 36" x 8'

72" 96" 60"

36" 36" 72"

4" 4" 4"

72" x 60"

C

B

IMPORTANT NOTE: ALL MESH PANELS WILL HAVE TO BE CUT, SEE DETAILED INSTRUCTIONS REGARDING PROPER CUT SIZES

C

Screws Provided

C3

C4

C5

#9-16 x 1-3/4" Top Bracket to Wood/Post Sleeve screw

#9-16 x 3" Bottom Bracket to Wood/Post Sleeve screw

#8-18 x 1-1/4" Top Bracket to Rail screw, Channel Attachment screw

1

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions

A. Top Stair Rail B. Bottom Stair Rail C1. Top Stair Bracket C2. Bottom Stair Bracket D. Mesh Panel E. Post sleeve cap* F. Post sleeve skirt* G. Post Sleeve*#

PARTS

E *

C1

I

L

A

K

J

> All-in-One 4x4 post sleeve > 4x4 post sleeve > 6x6 post sleeve H. Adjustable foot block (quantity of one is required for all railing span lengths) I. Top and Bottom Channels J. Top and Bottom Anti-Rattle Gaskets K. Side Channels

C2

D

C1

B

**

G

H

L. Side Anti-Rattle Gaskets M. Mesh Caps (not shown) *

Item not included in the Select railing kits. Note: when using the Select post sleeve, the cap and skirt are included with this post sleeve. *# 4 x 4 and 6 x 6 post sleeves are designed to fit over 4x4 pressure-treated post.

F *

1. Installing Pressure-Treated Posts » PLEASE REFER TO LOCAL BUILDING CODE REQUIREMENTS PRIOR TO ATTACHING PRESSURE TREATED POSTS. » PRESSURE TREATED POSTS MUST BE INSTALLED ON INSIDE OF STAIR STRINGER AND AT NOSE OF STAIR TREAD. » POST TO POST SPAN WILL BE LESS THAN 6' or 8'. PRIOR TO INSTALLING POSTS CALCULATE POST TO POST SPAN USING A MAXIMUM RAIL LENGTH REQUIRED AND THE ANGLE (32°- 37°) AT WHICH THE RAILS WILL BE INSTALLED. DO NOT INSTALL STAIR POSTS AT 6' SPAN, AS STAIR RAILINGS WILL THEN BE TOO SHORT. »  Post sleeve longer than 39" (991 mm) will be needed on the lower section of stair rail to accommodate stair angle.

2b. When using the 4 x 4 sleeve and two-piece skirt, slide post sleeve over post and down

2b

to rest on decking surface. Snap two piece skirt over post sleeve.

Note: Shims can be used to plumb post sleeves. Measuring and Cutting Bottom Rail 3. P lace a 1" deckboard on the nose of the stair tread.

3

1" (2.5 cm)

Installing Post Sleeve Skirts and Post Sleeves 2a.  When using the All-in-One or 6 x 6

2a

post sleeve and one- piece skirt, slide post sleeve skirt over post and down to rest on decking surface. Slide post sleeve over post and position inside post sleeve skirt.

2

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

HOW TO INSTALL MESH STAIR RAILING TREX SELECT ®

6

Attaching Brackets to Bottom Rail 6. S nap the top stair adaptor bracket (labeled TOP) to the standard

4

bracket. Repeat for remaining bottom bracket.

TIP: Use a dab of super glue when snapping bracket together. This will help stabilize bracket when installing.

4. S et bottom rail on top of deckboard. Mark rail at post locations and cut bottom rail. ENSURE POSTS ARE PLUMB BEFORE CUTTING RAILING.

7

NOTE: For any rail lengths over 6' AND when using aluminum rail stiffener, remove this from the top rail and cut the stiffener 4" shorter than the top rail cut length.

Top Rail

4" (102 mm)

2

4

7.

O n the BOTTOM RAIL, attach the assembled bottom stair brackets to the OPPOSITE SIDE of the baluster holes. Attach both brackets using three #8-18x1" self-drilling screws (C3).

IMPORTANT NOTE REGARDING FOOT BLOCK INSTALLATION: »

R efer to detailed instructions (Trex Select rail instructions) included with foot block prior to installation of railing section as these include other required steps for proper installation.

Attachment of Bottom Rail to Post

NOTE: For attachment of brackets to posts, use at least a 3" long drill bit or extension so as to not damage sides of rails when installing.

Marking Location for Foot Block to Bottom Rail

5

TIP: Pre-drill prior to screw installation using a 7/64" drill bit.

8a

8a. K eeping deck board on stair treads, center bottom rail on posts

1

4" (10 cm)

and attach bottom rail stair bracket to upper post using two #9-16 x 3" wood screws (C5).

2

5. M ark approximate location for foot block, allowing a measurement of 4" maximum. Invert the bottom rail, and at marked location drill a hole using a 3/16" drill bit in the center of the channel. Foot block is to be installed at last step.

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

8b

9b

8b. A ttach bottom stair rail stair bracket to lower post using two #9-16 x 3" wood

screws (C5). (deck board can now be removed).

IMPORTANT NOTE: SET DRILL TO LOW SPEED AND LOW CLUTCH SETTING WHEN INSTALLING THESE SCREWS. DO NOT USE IMPACT DRIVER.

Mark Location for Top Rail Height and Mark Location for Cutting Top Rail

9b. M ark top rail at intersection of posts. Do not remove top rail until after step 10.

9a

clamp

Measuring and Cutting Vertical Channels and Side Anti-Rattle Gaskets

tape

10a

36" or 42"

36" or 42"

36" or 42"

36" or 42"

9a. M easure up from front/nose of stair treads as listed above depending on your rail height. Ensure that the measurement is the same at each location. Temporarily clamp top rail in this location, ensuring its parallel to bottom rail. Use a removable tape to mark intersection at top and bottom post. Do not remove top rail until after step 10.

10a. With top rail still in place, align vertical channels against the inside of each post, mark at intersections on top and bottom rails and cut at these locations. Remove the top rail.

4

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

Measuring and Cutting Bottom and Top Anti-Rattle Gaskets

10b.Using same

10b

measurement from side verticals subtract 1 3/4" and cut side gaskets at same angles as the verticals.

12a

X minus 1-3/4"

12a.  Align bottom and top channel so they run parallel to bottom rail, ensuring the opening on the channels are facing each other, mark at location where these intersect with the side verticals, and cut both bottom and top channel to this length.

Installing Vertical Channels

11

12b

X+1"

12b. Using same measurement and orientation from top/bottom channels, add 1" and cut top and bottom anti-rattle gaskets to this measurement.

11.  Center vertical channel between posts, and attach screws into channel using three #8-18 x 1/14" self- drilling screws (C3). Install lower and upper screws approximately 1" from each end of channel. Center and install remaining screws.

NOTE: Both sides will have to be cut to accommodate angle.

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

15a

13

6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

Measuring and Cutting Mesh Panels 15b. Rest mesh panel on stair treads, and ensure mesh

15b

13. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (C3).

Cutting Top Rail and Attaching Top Stair Brackets

14

panel is running parallel to bottom rail. Mark mesh where this intersects at inside of rails and posts.

14. C ut top rail at previous marked locations. Center top stair brackets on each end of TOP RAIL. Ensure back of bracket is flush with end of rail, and attach using three #8-18 x 1 1/4" self-drilling screws (C3).

6 15a. Clamp or loosely place top rail onto side channels.

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

Install Mesh Caps

16

minus 7/8"

18

minus 7/8"

16. R emove mesh panel. Substract 7/8" from top of mesh, and only ONE SIDE of mesh and mark these locations. Cut at all marked lines. NOTE: An angle grinder (with proper blade) is recommended for cutting wire mesh. (ALWAYS USE PROPER SAFETY GEAR WHEN CUTTING WITH ANGLE GRINDER.) Note that heavy duty bolt cutters can also be used.

18. Install mesh caps on all cut ends.

Install Anti-Rattle Gaskets onto Mesh

19

Intalling Top Channel

17

6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

17. Remove top rail, and center top channel between slots in brackets and centering on rail (NOTE: There may be a slight gap on each end between brackets and channel), and install using #8-18 x 1 1/4" self-drilling screws (C3).

19. .Install top and bottom gaskets onto mesh panel, followed by side gaskets. Make sure all gaskets are centered and fully seated.

7

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

Installing Mesh Panel

Installing Top Stair Rail onto Mesh Panel

20a

21

21. P lace top rail assembly onto mesh rail, pressing down top rail until brackets fully rest on side channels.

20a. Insert mesh panel with anti-rattle gaskets into side channels.

20b

NOTE: Use a rubber mallet if required to fully seat top rail.

22

22. Secure top brackets to post using two #9-16 x 1 3/4" screws (C4).

23

Attaching Post Caps 23. Secure post caps

with silicone or PVC adhesive (apply adhesive on the inside self-centering/ corner tabs).  NOTE: Clean up any excess adhesive before it dries.

20b. P ush mesh firmly into the bottom and side gaskets.

IMPORTANT NOTE: IF NECESSARY USE SOAPY WATER ON THE VERTICAL ANTI-RATTLE GAS- KETS TO ALLOW MESH PANEL TO SLIDE DOWN MORE EASILY.

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0726

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14

Made with FlippingBook flipbook maker