_102527563MID-001b Emissions report FC1500 signed  | 1 | 
I. INTRODUCTION  | 4 | 
I.A PURPOSE OF TEST  | 4 | 
I.B LABORATORY  | 4 | 
I.C DESCRIPTION OF UNIT  | 4 | 
I.D REPORT ORGANIZATION  | 5 | 
II. SUMMARY  | 5 | 
II.A PRETEST INFORMATION  | 5 | 
II.B INFORMATION LOG  | 6 | 
II.B(1) TEST STANDARD  | 6 | 
II.B(2) Deviation from Standard Method  | 6 | 
II.C SUMMARY OF TEST RESULTS  | 6 | 
II.D DESCRIPTION OF TEST RUNS  | 6 | 
II.D SUMMARY OF OTHER DATA  | 7 | 
TABLE 1. – Data Summary Part A  | 7 | 
TABLE 3. – WEIGHTED AVERAGE  | 8 | 
TABLE 5. - GENERAL SUMMARY OF RESULTS  | 8 | 
III. PROCESS DESCRIPTION  | 9 | 
III.A TEST SET-UP DESCRIPTON  | 9 | 
III.B AIR SUPPLY SYSTEM  | 9 | 
III.C TEST FUEL PROPERTIES  | 9 | 
IV. SAMPLING SYSTEMS  | 9 | 
IV.A. SAMPLING LOCATIONS  | 9 | 
IV.A.(1) DILUTION TUNNEL  | 10 | 
IV.B. OPERATIONAL DRAWINGS  | 11 | 
IV.B.(1) STACK GAS SAMPLE TRAIN  | 11 | 
IV.B.(2). DILUTION TUNNEL SAMPLE SYSTEMS  | 12 | 
V. SAMPLING METHODS  | 12 | 
V.A. PARTICULATE SAMPLING  | 13 | 
VI. QUALITY ASSURANCE  | 13 | 
VI.A. INSTRUMENT CALIBRATION  | 13 | 
VI.A. (1). DRY GAS METERS  | 13 | 
VI.A.(2). STACK SAMPLE ROTAMETER  | 14 | 
VI.A.(3). GAS ANALYZERS  | 14 | 
VI.B. TEST METHOD PROCEDURES  | 14 | 
VI.B.(1). LEAK CHECK PROCEDURES  | 14 | 
VI.B.(2). TUNNEL VELOCITY/FLOW MEASUREMENT  | 15 | 
VI.B.(3). PM SAMPLING PROPORTIONALITY  | 15 | 
VII. CONCLUSION  | 15 | 
_Certificate of Conformity - FC1500  | 16 | 
A1_Lab Procedures for EPA Air Furnaces 11.11.16  | 17 | 
B1A_CSA B415 Stack Loss Run 1  | 26 | 
B1B_Furnace PreTest 1  | 28-29 | 
B1C_Furnace Test 1  | 30-31 | 
B1D_HY-C FC1500 test 1  | 32 | 
B2A_CSA B415 Stack Loss Run 2  | 41 | 
B2B_Furnace PreTest 2  | 42-43 | 
B2C_Furnace Test 2  | 44-45 | 
B2D_HY-C FC1500 test 2  | 50 | 
B3A_CSA B415 Stack Loss Run 3  | 59 | 
B3B_Furnace PreTest 3  | 60-61 | 
B3C_Furnace Test 3  | 62-63 | 
B3D_HY-C FC1500 test 3  | 64 | 
B4A_CSA B415 Stack Loss Run 4  | 72 | 
B4B_Furnace PreTest 4  | 74-75 | 
B4C_Furnace Test 4  | 78-79 | 
B4D_HY-C FC1500 test 4  | 82 | 
B5A_CSA B415 Stack Loss Run 5  | 92 | 
B5B_Furnace PreTest 5  | 94-95 | 
B5C_Furnace Test 5  | 96-97 | 
B5D_HY-C FC1500 test 5  | 98 | 
C1_008 ending 6 of 2016 due to EPA  | 108 | 
C2_029 ending 9 of 2016  | 110 | 
C3_160 ending 12 of 2016  | 111 | 
C4_646 ending 4 of 2017  | 112 | 
C5_713 ending 6 of 2016 due to EPA requirements  | 114 | 
C6_986 ending 10 of 2016  | 116 | 
C7_1133 ending 10 of 2016  | 117 | 
C8_1214 ending 4 of 2017  | 119 | 
1  | 119 | 
3  | 137 | 
4  | 153 | 
C9_1380 ending 9 of 2016  | 161 | 
C10_1393 ending 9 of 2016  | 162 | 
C11_1420 due 10 of 2016  | 163 | 
E1_1268 ending 6 of 2016  | 164 | 
E2_1413  | 165 | 
E3_1414  | 167 | 
Weighted Avg FC1500  | 170-171 | 
Made with FlippingBook - professional solution for displaying marketing and sales documents online