Complete Trex Select Aluminum railing installation guide including step-by-step instructions.
TREX SELECT ® ALUMINUM POSTS Installation Instructions for Pressure-treated Wood Framing
IMPORTANT NOTES: » E ACH POST MUST BE ATTACHED AS SHOWN TO ENSURE A CODE COMPLIANT AND SAFE INSTALLATION. » ALWAYS refer to your local building code official prior to installing any railing system to ensure all code and safety requirements are met. Trex cannot be held responsible for improper or non-recommended installations. » W hen installing Trex Select Aluminum posts on ACQ surfaces, use an appropriate isolation barrier between post and surface (contact local building code official if needed). » All Trex Select Aluminum stair installations require the use of a 53" (134.6 cm) stair post, measured and cut to appropriate length if necessary. TOOLS AND MATERIALS NEEDED » Drill and/or screw gun » 1/2" (1.3 cm) drill bit for wood » Blocking – 2 x 8 pressure-treated Southern Yellow Pine or equivalent » Qty: 36 (per post) – 3" pressure-treated compatible wood screws
IMPORTANT–IF INSTALLING TREX LIGHTING, SCAN QR CODE TO OBTAIN ADDITIONAL STEPS BEFORE ATTACHING POST TO FRAMING.
NOTE: TO ENSURE THE BLOCKING IS FULLY SECURE, USE THE AMOUNT OF SCREWS indicated ABOVE. TIP: Use two additional screws to "sandwich" blocking boards together for easier attachment to framing. Line Post Installation
Installing Select Aluminum Posts on Pressure- treated Wood Framing (Corner Post Installation)
3
Cross bracing frame
2 x 8 Pressure-treated Cross bracing frame
1
Cross bracing frame
3. Install two 2 x 8 cross bracing frames in between joists at 7-1/4" (18.4 cm). Attach a total of twelve 3" (7.6 cm) pressure-treated compatible screws (not provided) .
1. Install 2 x 8 cross bracing frame in between joists at 7-1/4 " (18.4 cm). Attach a total of twelve 3 " (7.6 cm) pressure-treated compatible screws (not provided) .
2
4
Blocking boards
Blocking boards
2. Install two 2 x 8 boards as blocking under post location. Securely attach blocking using a total of twenty-four 3" (7.6 cm) pressure-treated compatible screws (not provided).
4. Install two 2 x 8 boards as blocking under post location. Securely attach blocking using a total of twenty-four 3" (7.6 cm) pressure-treated compatible screws (not provided) .
1
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SE-AL-POS-0826
TREX SELECT ® ALUMINUM POSTS Installation Instructions for Pressure-treated Wood Framing
» Metal backplate is only required for 2.5" (6.4 cm) post in IRC installations. (Consult local code official for more information.)
5
6
\
5. Using post as a template, mark locations of holes. 6. D rill through decking and blocking boards using 5/8" diameter bit (long drill bit will be required).
7
7. Attach posts using four
3/8" x 6" (1.0 cm x 15.2 cm) hex cap bolts, washers, and nuts, along with aluminum back plate on underside of blocking. If the project requires IRC compliance, this back plate MUST be installed under the decking to ensure this will meet code compliance. Reference SKU part number ALPOSTHWDECK for
required hardware and aluminum plate. (Consult local code official for more information on IRC Compliance.)
Note: If attaching post directly to pressure-treated wood, use a thin stainless steel or plastic barrier strip under the baseplate.
2
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SE-AL-POS-0826
TREX SELECT ® ALUMINUM RAILING Horizontal Installation Instructions
IMPORTANT–IF INSTALLING TREX LIGHTING, SCAN QR CODE TO OBTAIN RAILING & LIGHTING INSTRUCTIONS / DO NOT USE INSTRUCTIONS BELOW. FAILURE TO DO THIS WILL RESULT IN IMPROPER RAILING AND LIGHTING INSTALLATION!
SCAN QR CODE IF INSTALLING COCKTAIL RAIL APPLICATIONS WITH TREX METAL RAILING SYSTEMS.
NOTES: » TREX SELECT ALUMINUM RAILING PANELS ARE DESIGNED TO BE ATTACHED WITH POSTS INSTALLED AT A CLEAR SPAN OF 6’ OR 8’. » WHEN INSTALLING COCKTAIL OR TRADITIONAL RAILING CONFIGURATIONS WITH SELECT ALUMINUM POSTS, YOU MUST USE TALLER POSTS. FOR 36". RAILING HEIGHTS USE 42" POST, FOR 42" RAILING HEIGHTS USE 53" POST. FAILURE TO DO THIS WILL NOT ALLOW POST CAPS TO FIT PROPERLY ON POSTS DUE TO INSUFFICIENT CLEARANCE. » DO NOT CUT SELECT ALUMINUM RAILING PANELS ON TOP OF DECK SURFACE. METAL FLAKING CAN BE DIFFICULT TO CLEAN. » ALWAYS WEAR APPROPRIATE SAFETY GLASSES WHEN CUTTING METAL. » IF USING A ONE-PIECE SKIRT ENSURE TO ATTACH THIS BEFORE ATTACHING RAILING. » IF USING THE SELECT ALUMINUM POST SLEEVE, COVER 4X4 PRESSURE-TREATED POST WITH PLASTIC, HOUSE WRAP, OR SIMILAR PRODUCT BEFORE INSTALL- ING ALUMINUM POST SLEEVE. » D O NOT USE IMPACT DRIVER WHEN INSTALLING SELECT ALUMINUM RAILING, ONLY USE STANDARD DRILL FOR SCREW ATTACHMENT OF BRACKET TO POSTS AND RAILS. » P LAN AHEAD FOR POST PLACEMENT IF PANELS REQUIRE CUTTING TO ENSURE THAT PANELS/BALUSTERS ARE CENTERED BETWEEN POSTS AND THERE IS ENOUGH RAIL CLEARANCE FOR ATTACHMENT TO BRACKETS. » IF ATTACHING TREX SELECT ALUMINUM RAILING TO PRESSURE-TREATED POST OR PRESSURE-TREATED POST/POST SLEEVES, ATTACH BRACKETS TO POSTS USING #10 X 1 3/4" STAINLESS STEEL SCREW (INCLUDED). » IF INSTALLING COCKTAIL RAIL PANEL WITH PRESSURE-TREATED POST AND POST SLEEVE CONFIGURATION, SEE PAGE 4 FOR INSTRUCTIONS ON CUTTING POSTS TO REQUIRED HEIGHTS BEFORE INSTALLING BRACKETS. » T REX SELECT ALUMINUM POSTS CAN BE PURCHASED SEPARATELY WHICH HAVE BRACKETS PREINSTALLED, THUS SKIPPING STEPS 1-4 BELOW. » S ELECT ALUMINUM RAILING PANELS REQUIRE A SINGLE FOOT BLOCK FOR ANY SPAN LENGTHS.
SKU NUMBER BKSAL2537PEND BKSAL2537PLINE BKSAL2537PCNR BKSAL2543PEND BKSAL2543PLINE BKSAL2543PCNR
DESCRIPTION 2.5" X 2.5" X 37" BK AL END PST 2.5" X 2.5" X 37" BK AL LINE PST 2.5" X 2.5" X 37" BK AL CORNER PST 2.5" X 2.5" X 43" BK AL END PST 2.5" X 2.5" X 43' BK AL LINE PST 2.5" X 2.5" X 43" BK AL CORNER PST
SKU NUMBER BBSAL2537PEND BBSAL2537PLINE BBSAL2537PCNR BBSAL2543PEND BBSAL2543PLINE BBSAL2543PCNR
DESCRIPTION 2.5" X 2.5" X 37" BN AL END PST 2.5" X 2.5" X 37" BN AL LINE PST 2.5" X 2.5" X 37' BN AL CORNER PST 2.5" X 2.5" X 43" BN AL END PST 2.5" X 2.5" X 43" BN AL LINE PST 2.5" X 2.5" X 43" BN AL CORNER PST
PARTS
D. S elect Aluminum Rail post cap E. Select Aluminum Rail post skirt F. Footblock G. Trex decking H. Trex fascia I. Code-approved wood joist 2 x 8 or larger J. Code-approved wood rim joist 2 x 8 or larger
D
A. Trex Select Aluminum Rail horizontal panel - 6 ’ (actual length 71.7) - 8 ’ (actual length 95.3") B. Trex Select Aluminum Rail upper and lower brackets and bracket covers C. Trex Select Aluminum post* - 36 " (actual length 37.5 ") - 42 " (actual length 43.5 ") - 53 " or Trex Post Sleeve# - All-in-One 4 x 4 composite post sleeve - 4 x 4 aluminum post sleeve
B
A
D
C
B
C
E
F
G
E
- 4 x 4 post sleeve - 6 x 6 post sleeve
H
I
* If installing cocktail or traditional railing configuration with Select Aluminum Railing: -For a 36" railing height - use a 42" post. -For a 42" railing height - use a 53" post. # C omposite and aluminum post sleeves are designed to fit over 4 x 4 pressure-treated post. Ensure to use correct post cap and skirt with corresponding post sleeve.
J
1
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
TREX SELECT ® ALUMINUM RAILING Horizontal Installation Instructions
HOW TO INSTALL SELECT ALUMINUM RAIL HORIZONTAL PANEL
Attaching Brackets if Using Select Aluminum Posts
Attaching Brackets if Using Pressure-Treated Posts with All-in-One Composite 4 x 4 Post Sleeves
1
2
1
Install One-Piece Skirt and Post Sleeve 1. Slide one-piece skirt down to rest on decking surface. Slide post sleeve over post and position inside post sleeve skirt.
34-7/8" (88.6 cm) or 40-7/8" (103.82 cm)
3-9/16" (9.05 cm)
3
2
1. M easure 3-9/16" up from deck surface. Mark with light line. 2. M easure 34-7/8" for 36" rail height or 40-7/8" for 42" rail height up from decking surface. Mark with light line.
33-9/16" (88.3 cm) or 39-9/16" (101.6 cm)
2-5/16" (5.8 cm)
4
3
2. Measure up from top of skirt 2-5/16". Mark with light line. 3. M easure up from top of skirt 33-9/16" for 36" rail height or 39-9/16" for 42" rail height. Mark with light line.
4
5
3. C enter lower bracket on post above the marked line and attach using two #10 x 3/4" self-drilling screws (provided) . 4. C enter upper bracket on post above marked line and attach using four #10 x 3/4" self-drilling screws (provided) .
4. Center lower bracket on post above the marked line and attach using two #10 X 1-3/4" stainless steel screws (included). 5. C enter upper bracket on post above marked line and attach using four #10 X 1-3/4" stainless steel screws (included).
2
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
HOW TO INSTALL SELECT ALUMINUM RAIL HORIZONTAL PANEL/ CONTINUED Attaching Brackets if Using Pressure-Treated Posts with Aluminum 4 x 4 Post Sleeves Attaching Brackets if using Pressure-Treated Posts with 4 x 4 Post Sleeves
1
1
Install One-Piece Skirt and Post Sleeve 1. Slide one-piece skirt down to rest on decking surface. Slide post sleeve over post and position inside post sleeve skirt.
1. Install post sleeve over pressure-treated post.
3
2
3
2
33-5/8" (85.4 cm) or 39-5/8" (100.1 cm)
34-7/8" (88.6 cm) or 40-7/8" (103.8 cm)
2-3/8" (6.0 cm)
3-9/16" (9.05 cm)
2. Measure up from top of skirt 2-3/8". Mark with light line. 3. M easure up from top of skirt 33-5/8" for 36" rail height or 39-5/8" for 42" rail height. Mark with light line.
2. Measure up from top of decking surface 3-9/16". Mark with light line. 3. M easure up from top of decking surface 34 7/8" for 36" rail height or 40-7/8" for 42" rail height. Mark with light line.
5
4
4
5
4. Center lower bracket on post above the marked line and attach using two #10 X 1-3/4" stainless steel screws (included) . 5. C enter upper bracket on post above marked line and attach using four #10 X 1-3/4" stainless steel screws (included).
4. C enter lower bracket on post above the marked line and attach using two #10 X 1-3/4" stainless steel screws (included). 5. Center upper bracket on post above marked line and attach using four #10 X 1-3/4" stainless steel screws (included).
6
6. Snap two-piece skirt over post sleeve.
3
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
TREX SELECT ® ALUMINUM RAILING Horizontal Installation Instructions
HOW TO INSTALL SELECT ALUMINUM RAIL HORIZONTAL PANEL/ CONTINUED
Attaching Brackets if using Pressure-Treated Posts with 6 x 6 Post Sleeves
How to Measure and Cut Panel Rails (When REQUIRED)
1
1
Install One-Piece Skirt and Post Sleeve 1. Slide one-piece skirt down to rest on decking surface. Slide post sleeve over post and position inside post sleeve skirt.
2
3
1. Position panel between posts and ensure there is equal distance on each of the end balusters and posts. Allow 1-1/2" on each side of rails to allow for attachment to brackets.
33-1/4" (84.5 cm) or 39-1/4" (99.7 cm)
2" (5.1 cm)
KEY Mark Cut
KEY
2
2. Measure up from top of skirt 2". Mark with light line. 3. M easure up from top of skirt 33-1/4" for 36" rail height or 39-1/4" for 42" rail height. Mark with light line.
5
4
3/8"
3/8"
2. Cut ends of both bottom and top rails 3/8" shorter on each side to allow for fit into brackets.
4. Center lower bracket on post above the marked line and attach using two #10 X 1-3/4" stainless steel screws (included). 5. Center upper bracket on post above marked line and attach using four #10 X 1-3/4" stainless steel screws (included).
Installing Foot Block
3
3. Turn panel upside down.
4
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
7 HOW TO INSTALL SELECT ALUMINUM RAIL HORIZONTAL PANEL/ CONTINUED
4
7. Attach top panel rails to top brackets using three #10 x 3/4" self-drilling screws.
1
3
2
Attachment of Bracket Covers, Skirts, and Caps
9
8
4. Center foot block insert on underside of bottom rail, and install using one #10 x 3/4" screw. Push foot block shaft onto foot block insert.
5
5. Gently tap foot block cap into foot block shaft.
8. G ently spread and then snap the corresponding bracket covers over opening in upper and bottom rails. 9. A ttach provided post skirt to bottom of post.
Installing Panel to Brackets
10
10. A ttach post caps to posts (use of a rubber mallet
6
may be required for secure attachment).
6. Place panel in bottom and top brackets.
NOTE: THERE WILL BE A SMALL GAP BETWEEN THE BRACKETS AND THE RAILS.
5
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
TREX SELECT ® ALUMINUM RAILING Horizontal Installation Instructions
HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS » HORIZONTAL SWIVEL BRACKETS CAN BE USED UP TO A 45° ANGLE FOR TREX SELECT ALUMINUM PANEL RAILINGS. » W HEN USING HORIZONTAL SWIVEL BRACKETS IT IS VERY IMPORTANT TO LAY OUT LOCATION AND ORIENTATION OF POSTS AND SWIVEL BRACKETS BEFORE INSTALLING SWIVEL BRACKETS. » ENSURE BARREL BOLTS ON SWIVEL BRACKETS ARE TIGHT DURING AND AFTER RAILING INSTALLATION.
Attach Lower Swivel Brackets to Select Aluminum Posts
Installing Upper Swivel Brackets to Select Aluminum Posts
5
1
2
3-1/8" (7.9 cm)
1. M easure 3-1/8" from decking surface. Mark with light line. 2. C enter lower bracket on post above the marked line and attach using four #10 x 3/4" self-drilling screws (provided).
5. P lace panel into lower swivel brackets. Temporarily place the upper swivel brackets onto the top rail and mark post at underside of bracket location. If necessary, use a clamp to hold brackets on top rail.
How to Measure and Cut Bottom and Top Railings (When Required)
6
6. C enter upper bracket on post above marked line and attach using four #10 x 3/4" self-drilling screws (provided) .
3
Installing Panel to Brackets
7
3. W ith lower brackets in correct swivel location, measure distance from inside of bracket to inside of bracket. Also allow for 1-1/2" clearance on each side for panel rails to attach to brackets. Cut panel as per previous instructions. Attaching Foot Block 4. A ttach foot blocks as per previous instructions on page 2.
7. A ttach panel to brackets using two #4 x 3/4" self-drilling screws (provided).
8. A ttach bracket covers, caps, and skirts as per previous instructions on page 3.
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
TREX SELECT ® ALUMINUM RAILING PANEL Stair Installation Instructions
IMPORTANT–IF INSTALLING TREX LIGHTING, SCAN QR CODE TO OBTAIN RAILING & LIGHTING INSTRUCTIONS / DO NOT USE INSTRUCTIONS BELOW. FAILURE TO DO THIS WILL RESULT IN IMPROPER RAILING AND LIGHTING INSTALLATION!
SCAN QR CODE IF INSTALLING COCKTAIL RAIL APPLICATIONS WITH TREX METAL RAILING SYSTEMS.
NOTES: » FOR A 6' OR 8' STAIR RAIL, POST TO POST SPAN WILL BE LESS THAN 6' OR 8'. PRIOR TO INSTALLING STAIR POSTS CALCULATE POST TO POST SPAN USING A MAXIMUM STAIR RAIL LENGTH REQUIRED AND THE ANGLE AT WHICH THE STAIR RAILS WILL BE INSTALLED. DO NOT INSTALL STAIR POSTS AT 6' OR 8' SPAN, AS STAIR RAILINGS WILL THEN BE TOO SHORT. » FOR STAIR INSTALLATIONS USE A 53" STAIR POST. POST CAN BE CUT TO DESIRED HEIGHT ONCE RAILING HEIGHT IS ESTABLISHED. ENSURE ADEQUATE SPACE FOR POST CAP TO FIT PROPERLY. » DO NOT CUT SELECT ALUMINUM RAILING PANELS ON TOP OF DECK SURFACE. METAL FLAKING CAN BE DIFFICULT TO CLEAN. » ALWAYS WEAR APPROPRIATE SAFETY GLASSES WHEN CUTTING METAL. » USE CAUTION WHEN INSTALLING STAIR PANEL AS TOO MUCH RACKING MAY CAUSE PANEL TO DISENGAGE. » ENSURE BARREL BOLTS ON SWIVEL BRACKETS ARE TIGHT DURING AND AFTER RAILING INSTALLATION. » SELECT ALUMINUM STAIR RAIL PANELS REQUIRE A SINGLE FOOT BLOCK FOR ANY SPAN LENGTHS.
TOOLS NEEDED
7/64" (2.8 mm)
1
Attaching Upper and Lower Stair Swivel Brackets
1. Install post close to nose of stair tread directly above the required blocking. ALWAYS refer to your local building code official prior to installing any railing
3
system to ensure all code and safety requirements are met. Trex cannot be held responsible for improper or non-recommended installations.
2
3. A lign the bracket with top and bottom railing. Mark a light line on post above the swivel base.
2. U se a 1" deck board as a spacer board and lay this on the stair treads between the posts. Place stair panel on top of the deck board and clamp stair panel to posts. Ensure that balusters are straight and positioned with equal spacing at post locations. Make a small mark near the center of the panel for the location of the foot block.
1
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALST-0826
TREX SELECT ® ALUMINUM RAILING PANEL Stair Installation Instructions
KEY Mark Cut
KEY
4
6
1/16"
4. C enter stair brackets on posts below the marked line and attach using four #10 x 3/4" self-drilling screws (provided). In some cases it may be difficult to attach the stair bracket on the lower stair post. A 90˚drill or adapter is recommended to attach screws in this area.
6. R emove panel and place on flat surface (note stair panel can be "unracked" if necessary for ease of cutting - use caution as balusters may come lose). Extend marks to side of rails. Brackets are designed to allow for railing to be installed with a standard perpendicular cut. Cut end of rails 1/16" shorter than mark on each side to allow for a better fit.
Marking and Cutting Stair Panel Rails (when required)
5
Installing Foot Block Insert
7
5. M ark top and bottom rails where they align with the rear wall of the top and bottom brackets.
7. Turn panel upside down.
2
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALST-0826
8
11
11. Gently tap bottom plug into cut side foot block (this will cover exposed cut aluminum).
2
12 12
12. Install foot block shaft to foot block insert with one #10 x 3/4" screw. Attachment of Bracket Covers, Skirts, and Caps
8. Install foot block insert on underside of bottom rail at marked location using one #10 x 3/4" screw.
Attaching Stair Panel to Stair Swivel Brackets
9
13
1
14
9. A ttach stair panel to swivel brackets using two #10 x 3/4" self-drilling screws (provided) .
Installing Foot Block Shaft
KEY Mark Cut
KEY
10
13. G ently spread and then snap corresponding bracket covers over opening in upper and bottom rails.
14. Attach provided post skirt to bottom of post.
15
15. A ttach post caps to posts (use of a rubber mallet
may be required for secure attachment).
10. P lace foot block shaft beside mounted stair panel, mark above mounting hole (also allow for bottom rail clearance) and cut to length.
3
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALST-0826